







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Kitchen Remodeling for North Las Vegas Homeowners
Most North Las Vegas kitchens were built to a 1990s or early-2000s production-home spec, and by now the cabinets are settling, the laminate is lifting at the seams, and the layout fights anyone trying to cook for more than two people. A kitchen remodel fixes the parts you see and the parts that fail first: the cabinet boxes, the countertop substrate, the tile membrane under the floor. Our technicians have up to 19 years of experience with exactly that kind of work, and every job starts with a flat written price before anyone picks up a tool. We don’t promise same-day remodels, because nobody remodels a kitchen in a day. We promise a documented scope, a signed change order before any change, and a written warranty you can hold us to. Call (844) 708-4417 to schedule your free estimate.
What Our Kitchen Remodeling Service Includes

Kitchen Remodeling at Rowan Construction Group North Las Vegas covers the full scope from demolition through final punch list. Every project runs under The Haven Standard, which means the price is written before work starts and nothing changes without a signed change order. Here’s how each piece fits.
Full Kitchen Remodeling
A full remodel means tearing out the existing kitchen down to the studs and rebuilding the layout, cabinets, counters, backsplash, flooring, lighting and plumbing connections. You need it when the layout itself is the problem: a wall blocking the work triangle, a peninsula nobody can walk past, or a pantry that was built for a family of three and now serves six. We pull the permits and schedule the inspections, so the finish work doesn’t sit waiting on a sign-off.
Cabinets & Countertops
We specify and install cabinet lines like KraftMaid and Wellborn, set over Cambria or Caesarstone quartz surfaces. This pairing matters because the cabinet box and the countertop load have to agree; a 3 cm quartz slab on a cabinet run that isn’t dead level will crack at the sink cut-out within a few seasons. Our crews set cabinet boxes with shims and a laser level, then template the countertop to the cabinet as built, not to the drawing.
Backsplash
Backsplash work sounds simple until the wall behind it isn’t flat. In North Las Vegas, we regularly see drywall that was never squared at the counter line, which shows up as widening grout joints across the run. We check the wall plane first, float it flat where needed, and set tile on a waterproofed substrate. If you’re keeping your counters and only replacing the splash, we protect the surface and finish in a day or two.
Tile & Flooring
Kitchen flooring takes more abuse than any other floor in the house: dropped pans, spilled oil, chairs dragged across it daily. We install porcelain tile, luxury vinyl plank and engineered wood over a properly prepped substrate, which means the old vinyl and glue come up first and the slab gets checked for cracks and moisture. We also set a crack-isolation membrane under tile, because North Las Vegas slabs move with the summer heat and a rigid tile bed won’t tolerate that movement.
Kitchen Design & Layout
Design work here means measuring the actual room and drawing a layout around how you cook, not around a catalog photo. We look at the work triangle (sink, range, refrigerator), landing space beside the oven, and where a dishwasher door will swing into traffic. If you’re planning a larger structural change, we’ll coordinate it with the same written scope and permit process, and similar ADD-A-ROOM projects in the region run through the same documentation discipline.
Small & Partial Kitchen Remodels
Not every kitchen needs a full gut. A partial remodel might mean new doors and drawer fronts, a countertop swap, or replacing just the peninsula. We scope the partial work honestly and tell you when a partial would cost more than it saves, which happens most often when the existing boxes are particleboard that has swollen at the toe kick.
Cabinet Installation & Refacing
Cabinet installation is the piece where small errors compound, so we level, shim, and check plumb on every box before the next one goes in. Refacing keeps the existing box and replaces the doors, drawer fronts and exposed face frames. We recommend refacing when the boxes are solid plywood and the hinges are serviceable, and full replacement when the boxes are failing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Service for Kitchen Remodeling
Kitchen hardware and cabinet lines fail in predictable ways, and knowing those failure points saves you money on a remodel. Therma-Tru entry systems and ViewLux window units come up often on kitchen projects because a kitchen remodel usually means replacing the door to the garage or the window over the sink. We know how Therma-Tru frames take a twist when the rough opening isn’t squared, and we check the rough opening before the unit arrives so the door swings clean.
Barrette and Master Halco come up when a remodel extends to the backyard, which is common when a homeowner wants to add an outdoor cooking pad or extend a patio off the kitchen. We work with their fence and gate systems often enough to know where they hold up to desert sun and where they don’t. Whether your project touches Therma-Tru, ViewLux, Barrette or any other make, we’ll review the spec with you before the order goes out.
Signs You Need Kitchen Remodeling Right Now
- Cabinet doors that won’t stay closed. When hinges won’t hold and the boxes are soft around the screws, the cabinet is done. That’s usually plywood swelling at the toe kick, a sign a North Las Vegas slab has drawn moisture into the base.
- Countertop cracks near the sink or cooktop. A crack that runs from the sink cut-out outward means the substrate under the counter has failed or the cabinet run has settled. Left alone, that crack reaches the edge and the whole slab goes.
- Grout lines widening across the floor. Grout that keeps cracking in the same line means the tile bed is moving with the slab. A crack-isolation membrane fixes the cause; regrouting only hides it.
- Persistent musty smell under the sink. A smell that stays after cleaning usually points to a slow leak behind the cabinet back or under the dishwasher. We find it with a moisture meter before we quote the rebuild.
- A layout you’ve worked around for years. If you’ve memorized where you have to step sideways to open the oven, the layout is the problem. That’s a design job, not a cosmetic fix.
Our Kitchen Remodeling Process – Step by Step
- 1
On-site walkthrough and measurement. We measure the room, check the slab for cracks and moisture, and inspect the cabinet boxes and the wall plane behind the backsplash. You leave that visit with a written scope.
- 2
Written price and written scope. Under Clause 1 of the Haven Standard, the price is written before any work starts. That flat number comes with the scope spelled out line by line and a written warranty, not a range and a handshake.
- 3
Permits and scheduling. We pull the permits and schedule the inspections so the rough-in work doesn’t stall the finish. Your project gets a start date and a sequence, and you know who arrives on what day.
- 4
Build and documented checkpoints. Every visit includes a documented photo record, which means you get pictures of the wall behind the cabinets, the substrate under the tile and the plumbing behind the sink. If a change comes up, no work proceeds until the change order is signed.
- 5
Final walkthrough and warranty. We walk the finished kitchen with you and check every drawer, door and outlet. The 365-Day Done Right Promise is printed on the paperwork: if it isn’t done right, we make it right.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Kitchen Remodeling Cost in North Las Vegas?

A full kitchen remodel in North Las Vegas runs $14,000 to $45,000, and that spread comes down to whether you’re moving walls, plumbing and electrical or keeping the layout. A small kitchen remodel runs $9,000 to $20,000. Cabinet installation alone runs $4,000 to $13,000, countertop installation $2,000 to $6,500, backsplash $800 to $2,500, and a kitchen island $3,000 to $10,000.
| Scope | Typical North Las Vegas price |
|---|---|
| Full kitchen remodel | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
What moves the number most is plumbing relocation, a new electrical panel feed, and cabinet grade. You can avoid overpaying by getting the substrate and structural work scoped first and the finishes chosen second, since changing cabinet lines mid-build is where budgets break. Every free estimate from us comes with a written line-item scope and a written warranty, and if you bring a competitor’s quote, we’ll review it line by line at no charge as a free second opinion. Call (844) 708-4417 for an exact quote, and the estimate is free.
Kitchen Remodeling Near North Las Vegas – Our Service Area
We serve homeowners across North Las Vegas and the surrounding valley, including Moapa Town, Sunrise Manor, Whitney and Winchester, with most visits scheduled within a few business days of your call. Projects in Summerlin, Spring Valley, Henderson and Boulder City are part of the same service map. If you’re in Moapa Town and comparing contractors, our kitchen remodeling in Moapa Town page covers what’s different about that market. For homeowners closer to the east side, read the kitchen remodeling in Sunrise Manor page for local pricing and layout notes.
Serving North Las Vegas, NV – Our Local Coverage Area
We serve North Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Kitchen Remodeling in North Las Vegas

Kitchen remodeling is the process of replacing or reconfiguring the fixed parts of a kitchen: cabinets, countertops, backsplash, flooring, lighting, and the plumbing and electrical behind them. It ranges from a partial refacing job to a full gut down to the studs with a new layout. Our scope is written line by line before work starts, so you know exactly which parts are being replaced. Call (844) 708-4417 and we’ll walk you through what your kitchen actually needs.
A small or partial kitchen remodel typically takes two to three weeks, while a full remodel with layout changes runs six to twelve weeks depending on permit timing and cabinet lead times. Cabinet and countertop orders drive most of the schedule, which is why we place the orders before demolition. We give you a sequence at the start so you know when the crew is on site and when you’ll be without a working sink. Call for a written timeline with your estimate.
A full kitchen remodel in North Las Vegas runs $14,000 to $45,000, with small remodels at $9,000 to $20,000 and cabinet installation at $4,000 to $13,000. The range tracks how much plumbing and electrical moves and what cabinet and countertop lines you choose. We deliver a flat written price with a written scope before any work starts, so the number doesn’t drift once the walls open. Call (844) 708-4417 for an exact quote, free of charge.
Yes, we install and work around Therma-Tru doors and ViewLux windows as part of kitchen projects. A kitchen remodel often touches the back door or the window over the sink, and we verify the rough opening is square before the unit arrives so the door swings clean. Are your frames out of square from an old install? Our crew checks that before we order. Call our team for a free estimate covering the full kitchen scope.
No, and that’s deliberate. Kitchen remodeling is planned construction, not an emergency service, and any contractor promising a same-day remodel isn’t being straight with you. What we do offer is a live person answering the phone around the clock, so you can reach someone at any hour to book an estimate or ask about an active project. For a water leak or a failed counter, call (844) 708-4417 and we’ll tell you what to do next.
Every project carries the 365-Day Done Right Promise: if the work isn’t done right, we make it right, and the promise is backed by written terms rather than an asterisk. You also get a written warranty spelling out what’s covered and for how long with your written scope and change orders. Our crews are background-checked and uniformed, and every visit includes a photo record you keep. Call for a copy of the warranty with your free estimate.
Clear the cabinets and the countertops before demolition day and set up a temporary kitchen somewhere else in the house, because the sink and range will be offline for stretches. We’ll tell you which days the power or water gets shut off so you can plan around them. Protect floors along the crew’s path, and keep pets out of the work zone. We cover the sequence and shutdown days in your written scope, so nothing catches you off guard. Call (844) 708-4417 to get started.
Schedule Your Kitchen Remodeling Service in North Las Vegas Today
Call (844) 708-4417 to schedule your free estimate on kitchen remodeling in North Las Vegas. Our team answers around the clock, brings a written scope and flat price on the first visit, and documents every step with a photo record you keep. No obligation, no pressure, and a free second opinion if you already have a competitor’s written bid. A better kitchen starts with a number you can compare.
Written by the team at Rowan Construction Group North Las Vegas.












