







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterSmall & Partial Kitchen Remodels in North Las Vegas, NV
A small or partial kitchen remodel in North Las Vegas typically costs $9,500 to $32,000 and covers one focused zone of the room – the cabinets and countertop run, the flooring, the lighting, or a single layout change – rather than a full gut. It’s the right scope when the room’s bones (plumbing walls, footprint, structural openings) are working and only the surfaces and fixtures have aged out. Most partial remodels here run two to four weeks from demolition to final walkthrough.
We build these projects the same way we build every project: a flat written price and a written scope before anyone picks up a tool, a signed change order before any change proceeds, and a documented photo record when the crew leaves. That discipline is the reason our work finishes within a few percent of the number the customer agreed to, across 4,000-plus jobs since 2007. For the whole-room version of this work, see our Kitchen Remodeling in North Las Vegas page; for anything below that, call us at (844) 708-4417 and we’ll tell you honestly which scope your kitchen actually needs.
Our technicians have up to 19 years of experience, are background-checked, and arrive in uniform. A live person answers the phone around the clock. Sourcing runs through more than fifty vetted brands, including KraftMaid and Wellborn cabinets and Cambria and Caesarstone countertops, which lets a written quote use honest numbers instead of inflated allowances.

When You Need a Small or Partial Kitchen Remodel
Most of the calls we take in North Las Vegas aren’t for full tear-outs. They’re for one specific failure a homeowner is tired of living with. The scenarios below are the ones we see most.
- The cabinet boxes are sound but the doors, drawers and hardware are done. In the 1990s and early-2000s builds across the Aliante and Eldorado neighborhoods, the cabinet carcasses hold up fine; the hinged doors sag, the drawer glides give out, and the laminate faces peel. Refacing or a door-and-drawer swap on the same boxes costs a fraction of new cabinetry and leaves the layout untouched.
- The countertop has failed at the seam or around the sink. North Las Vegas water runs hard, and a laminate or older solid-surface top that was never sealed at the cutout will swell or stain around the sink within a few years. Swapping just the top – not the cabinets – with a Cambria or Caesarstone quartz surface solves it permanently.
- The layout works, but the room is dark. A partial remodel that replaces a soffit and adds recessed lighting, or that swaps a pass-through wall for a proper opening, fixes the two complaints we hear most: “there’s no light” and “we can’t see the kids from the kitchen.”
- One appliance died and the opening no longer fits the replacement. A new range or fridge in a different depth or width means widening or trimming the cabinet run and sometimes moving a gas or water line. That’s a small job, but not a DIY one – gas and plumbing work belong with a trained professional.
- The flooring has lifted or the grout has cracked at the transition. Slab movement and our summer heat can crack tile at the doorways and along the toe kick. Replacing just the kitchen floor, rather than the adjoining areas, is a common partial scope.
- You’re selling or renting and need the room to show well on a budget. A dated kitchen is the fastest way to lose a buyer. A focused partial remodel – paint, a new top, hardware, lighting, and a backsplash – delivers the “updated kitchen” a listing needs without the cost of a full build.
Our Small & Partial Kitchen Remodel Process
Every partial remodel follows the same sequence. The steps aren’t optional and the order doesn’t change based on the size of the job.
- Walkthrough and written scope. We come out, measure the room, and look at what’s under the surfaces – the substrate behind the backsplash, the condition of the cabinet boxes, the plumbing rough-in behind the sink. We tell you what we found in plain terms, then explain what it means for the scope. No guessing, no allowances that get adjusted later.
- Flat written price, before any work starts. You get a flat price and a written scope before a single box moves. Under Clause 1 of The Haven Standard, the price is written first – “call for a quote” isn’t a step in our process. If you’d like to compare, bring a competitor’s written estimate and we’ll review it line by line at no charge.
- Material selections with names attached. Cabinets from KraftMaid or Wellborn, quartz from Cambria or Caesarstone, fixtures from Kohler or Toto. You’ll see the exact model and finish on the quote, not a vague allowance.
- Demolition and protected staging. We mask the doorways and flooring in the adjoining rooms, pull the demolition (countertop, backsplash, cabinet doors, flooring as scoped), and photograph the exposed substrate so you see what was behind the old surfaces.
- Installation, with the change-order rule in force. Cabinets set and leveled, countertop templated and installed, backsplash set, lighting hung, plumbing and gas reconnect done by licensed trades. Any change that comes up on site gets a written change order before it gets built.
- Walkthrough, written warranty and photo record. We walk the finished room with you, hand over the written warranty, and leave you a documented photo record of what was found and what was done. The 365-Day Done Right Promise covers the work for a full year – if something isn’t done right, we make it right.

Small & Partial Kitchen Remodel Pricing in North Las Vegas
Here is what partial scopes actually cost in North Las Vegas. Every project is quoted with a flat written price before work begins, so these ranges exist to help you budget and compare – not to be adjusted upward later.
| Scope | Typical range |
|---|---|
| Cabinet refacing on existing boxes (doors, drawers, hardware) | $4,200 – $8,500 |
| New cabinet boxes, same layout (KraftMaid or Wellborn) | $8,500 – $16,000 |
| Countertop replacement only (Cambria or Caesarstone quartz) | $3,200 – $7,500 |
| Backsplash replacement (tile or slab) | $1,800 – $4,500 |
| Kitchen-only flooring replacement (tile, LVP) | $2,400 – $6,800 |
| Recirculating or replaced lighting plan (recessed + under-cabinet) | $1,500 – $4,200 |
| Half-wall opening or pass-through | $4,500 – $11,000 |
| Full partial remodel: top, backsplash, cabinets, lighting | $9,500 – $32,000 |
What moves the number: the material tier you choose, whether the plumbing or gas lines have to move, whether the slab or framing underneath is sound once the old surfaces come off, and the size of the kitchen. A small galley in a Centennial Hills condo and a builder-grade kitchen in a five-bedroom in the Aliante master plan are different jobs even when the scope sounds identical on paper.
All of it lands in a written scope before we start. Estimates are free, and we’ll review any written estimate you’re holding from another contractor at no charge. Call (844) 708-4417 to schedule.
FAQs – Small & Partial Kitchen Remodels
How much does a small kitchen remodel cost in North Las Vegas?
A partial kitchen remodel in North Las Vegas typically runs $9,500 to $32,000, and a focused single-scope job like a countertop or cabinet refresh runs $3,200 to $16,000. The biggest drivers are the material tier and whether plumbing, gas, or electrical has to move. Call (844) 708-4417 for an exact quote – estimates are free.
Is it cheaper to reface my cabinets or replace them?
Refacing is cheaper in almost every case where the cabinet boxes are sound – typically $4,200 to $8,500 versus $8,500 to $16,000 for new boxes in the same layout. The question is whether the boxes are solid and level; on a 1990s build with water damage at the sink cabinet, replacing the run makes more sense. We’ll tell you which you actually need after we look at the substrate.
Can you do a partial remodel in segments, one zone at a time?
Yes, and many of our North Las Vegas customers do. The most common sequence is countertop and backsplash first, then the cabinets, then flooring and lighting in a later phase. Each phase gets its own written flat price, its own signed scope, and its own photo record – so the total cost is transparent at every step.
Do you need permits for a partial kitchen remodel in North Las Vegas?
Cosmetic scopes – paint, countertop, backsplash, refacing – generally don’t require a permit, but anything that moves plumbing, gas, electrical, or a structural wall does. North Las Vegas is under the Southern Nevada building code, and the city’s permitting office has its own review process. We pull the permits required for the scope and tell you in writing before work starts which permits a job needs.
How long does a partial kitchen remodel take?
Most partial scopes finish in two to four weeks from demolition to final walkthrough. A countertop-and-backsplash swap can be done in a week; a full partial remodel with cabinets, top, lighting, and flooring typically runs three to four weeks, depending on material lead times and whether the plumbing or electrical rough-in has to move.
If you want a written price you can compare against another quote, call Rowan Construction Group North Las Vegas at (844) 708-4417. We’ll schedule a free estimate, walk the kitchen with you, and put the number in writing before anyone picks up a tool. The 365-Day Done Right Promise applies to every job, and every visit includes a documented photo record.
Written by the team at Rowan Construction Group North Las Vegas, serving North Las Vegas.


